Page 57 - 256149_ArchDC_Winter 2021
P. 57

Main entrance to the Peterson Middle School
                   at the Flint Hill School.
















































    All photos ©
   Prakash Patel
                                                                        Project: Peterson Middle School
                                                                        at Flint Hill School,
                                                                        10900 Oakton Road, Oakton, VA
                                                                        Architect/Interior Architect: Bowie Gridley Architects
                                                                        Landscape Architect: Brian J Stephenson + Co. LLC
                                                                        Structural Engineer: McMullan & Associates, Inc.
                                                                        MEP Engineer: Greenman-Pedersen, Inc.
                                                                        Civil Engineer: VIKA
                                                                        Acoustical Consultant: Acoustical Design Collaborative Ltd.
                                                                        AV/IT/Data/Security Consultant: Convergent Technologies
                                                                        Design Group, Inc.
                                                                        Food Service Consultant: Tricon Food Service
                                                                        Envelope Consultant: Gale Associates, Inc.
                                                                        Owner’s Representative: Advanced Project Management
                                                                        Renderer/Video Consultant: Illustrate My Design
                   Outdoor play area.                                   General Contractor: Whiting-Turner Contracting Company


                       every department,” Robinson remembered, along   environments to allow that curriculum to expand.
                       with small groups of students, parents, and other   The new building was intentionally designed “to
                       school personnel. The middle-grade syllabus at Flint   encourage students to explore, invent, and be creative,”
                       Hill already included interactive, discovery-based   said Robinson.
                       classes like robotics and a makers lab, but students and   Constructed of light-frame steel and glass, the
                       educators desired larger, more flexible, tech-friendly   building is spacious and bright, with soaring double-


                                                                                  TEENAGE DREAM                   55
   52   53   54   55   56   57   58   59   60   61   62