Page 28 - ArchDC_Summer2021
P. 28

Welcome area adjacent to the entry.



        take. “We decided that the plan, being mostly open, is
        adaptable to a wide range of scenarios,” said Klinner.
        Construction was completed in May 2020, and the firm
        moved in—to the extent possible given the timing.
        About four employees have worked in the office most
        days, but as of this writing (mid-April 2021), things
        were picking up, including the first client meeting in
        one of the rooms in the “floating box.”
            Perhaps not surprisingly, given that the exterior
        facades of the Southern Building feature sumptuous,
        shiny, white, and carefully-composed Beaux-Arts
        ornamentation, stripping the interiors down to the
        somewhat random, gritty, and richly colored structure
        was a foreign concept to the building’s management.
        But Studio Twenty Seven’s suite has sparked a
        revolution. “Everyone—from management to custodial
        staff—was really enthralled by our columns and
        ceiling,” said Klinner. In what is perhaps the ultimate
        compliment, the stripped-down approach is now being
        replicated in other suites.





















        26                     LOFTY AMBITIONS           Kitchen.
   23   24   25   26   27   28   29   30   31   32   33