Project: Architectural Studio Space,
             Washington, DC

             Architect: Studio Twenty Seven Architecture
             Structural Engineer: Ahart Structural Engineering
             MEP Engineer: Engenium Group
             General Contractor: FreeState Electrical Construction Co.



































            Lofty Ambitions
            Lofty Ambitions                                                                   Open-plan workstations in the offices
                                                                                               of Studio Twenty Seven Architecture.


                                                                                                All photos © Anice Hoachlander/
                                                                                                   Studio HDP, except as noted

            An Architecture Firm’s Own Studio

            Celebrates Raw Structure and Space

            by Steven K. Dickens, AIA, LEED AP


        It’s always interesting to see what happens when a multiple-  of the redoubtable architect Daniel Burnham in the heart of
        award-winning design firm turns its attention inward. Studio   downtown DC. The building is U-shaped, with the available
        Twenty Seven Architecture has a broad portfolio including   fourth-floor suite occupying the entirety of one leg.
        charter schools, private residences, and the Aya, the transitional   Pre-modern office buildings are distinctly different from
        shelter for homeless families that won the Grand Award in last   modern ones. Most notably, before air conditioning, the need
        year’s AIA|DC Chapter Awards Program. The firm’s work has a   for cross-ventilation forced floor plates to be shallower and
        certain consistency as an inventive, friendly, and interactive strain   operable windows to be numerous. Before the concrete frame
        of modernism, but the particulars vary from project to project.    was perfected, hybrid structural systems of concrete, steel, and
            “We had not outgrown our previous space, which was in   load-bearing masonry were common. Before modern computing
        a building a few blocks away,” said Allyson Klinner, AIA,   capabilities, the term “structural grid” had much more resonance:
        project architect for Studio Twenty Seven’s new offices. But,   it was difficult to calculate forces and stresses in irregular
        approaching the end of the lease, they were looking for a   systems, so structural grids needed to be simple and consistent.
        “refresh”—although they were unsure as to exactly what form   At the Southern Building, Studio Twenty Seven was
        that might take. The answer came when they were shown an   sold on the windows wrapping the space, with the bonus of
        appropriately-sized space in the Southern Building, a 1914 work   a Washington Monument view from the front corner. The


        22                     LOFTY AMBITIONS