Page 40 - Fall_2017
P. 40

ArchDC Fall 2017.qxp_Fall 2017  8/10/17  1:06 PM  Page 38
























































        Basement work area.


        floor structure above is painted white and the existing concrete floor
        slab was leveled, stained and polished. An accessible restroom and
        shower were added. The basement opens onto a quiet rear patio,
        furnished simply with picnic tables and planters.
                Upstairs, a library and conference space provides a quiet
        retreat from the bustle of the shared workspaces below.
                Service functions (kitchens, bathrooms, and storage) are
        efficiently clustered in the rear of the building. HVAC system
        improvements include an upgraded air handler and independently
        controlled ductless split systems on each floor.
                In a neighborhood on the cusp of transformation, Mains envi-
        sions 5 Points as a bridge between longtime residents and new
        arrivals. So far, he’s seeing signs of success. Local business owners,
        including the barber two blocks down, frequently swing by to say
        hello. ANC meetings have been held after hours in the street-level
        space. Freelancers and aspiring business owners are connecting
        with each other, building community one relationship at a time.

                                                                Conference room on the partial second floor at the
                                                                rear of the building.

           38                     STARTING UP IN WOODRIDGE
   35   36   37   38   39   40   41   42   43   44   45