Page 53 - Fall_2017
P. 53
ArchDC Fall 2017.qxp_Fall 2017 8/10/17 1:16 PM Page 51
Open office area, with crane
original to the building overhead.
Project: Mercury Public Affairs at Boilermaker,
Washington, DC
Architects: Teass \ Warren Architects
MEP Engineers: KK Engineering
Lighting Consultants: Coventry Lighting Design
Contractor: Camson Construction
THE MEDIUM IS THE MESSAGE 51