Page 27 - Fall_2017
P. 27

ArchDC Fall 2017.qxp_Fall 2017  8/10/17  1:06 PM  Page 25


                               With its extensive use of glass, one might think the  [at 627 I Street], and to move two other row houses [at
                       building is an energy hog, but that’s not the case. “Several  621 and 623 I Street] to the east end of the block, where
                       strategies allowed the use of the glass,” Martin said. “The  they could reinforce the existing row houses there.”
                       orientation of the Massachusetts Avenue side is just east          Even more challenging, he added, “was to create,
                       of north, so it has very little solar gain. On the south side,  out of all these regulatory restraints, a cohesive piece of
                       the glass wall has a system of sunshades, using fritted  architecture.” To accomplish that, “we worked the design
                       glass to cut down on solar gain. The glass itself [from  out in massing models first, taking advantage of one
                       Viracon] is a high-performance insulated glass unit and  unique aspect of the site: the amount of space allowed
                       the curtain wall structure has an integral thermal break.”  under the zoning was considerably less than what could
                       The glass on the south side has a special coating and a  have been built within the height limits, so we didn’t
                       slightly grey tint to reduce solar gain, while the glass on  have to create a box.” The site’s complex shape “worked
                       the north side has a slightly different coating and a clearer  to create floors with lots of window wall. Despite all of
                       tint. The building’s numerous sustainable design features  the complexities and hurdles we faced working on this
                       earned it a LEED Platinum certification—the highest  site, I feel that we did create a cohesive architectural
                       possible LEED certification.                    design that has both its own integrity and reinforces the
                               Although it is a new building, 600 Massachusetts has  surrounding context.”
                       a long history—Martin drew the first sketches for the          Working on this site, Martin said, “reinforced my
                       project for developer Gould in 1981. “I first sketched an  view that the DC zoning code normally has an almost
                       office building fronting on Massachusetts Avenue,” Martin  one-to-one correlation between the envelope allowed and
                       said. “As the developer acquired lots facing I Street, we  the number of square feet allowed. The result is basically
                       explored a two-building solution. Some elements of the  a series of boxes. I support the height limit in general, but
                       current design began to appear in the early schemes—the  I would suggest increasing the allowable height by one
                       height on Massachusetts Avenue, and how a new office  floor—but not increasing the FAR [floor area ratio—the
                       building would meet the historic I Street.”     ratio of a building's total floor area to the size of the site
                               The new building at 600 Massachusetts “is one of the  upon which it is built]. This will give designers greater
                       most challenging projects that I have worked on,” Martin  flexibility to shape the buildings and possibly create public
                       said. “The site was in two different zoning districts. We had  space on site.”
                       to get approval from the Office of Planning, the Historic          In Washington, he added, “with the increasing layers
                       Preservation Review Board (because the south half was in  of civic and governmental review, architects must fight for
                       the downtown historic district), the Chinatown Steering  excellence and avoid the easy compromise in the design
                       Committee (because the entire site was within the  of buildings. I do feel that design can have complexity
                       boundaries of the Chinatown District), and the City  with integrity. All of that said, the quality of design in
                       Council, which had to rule on an alley closing. We also  Washington office buildings has definitely improved over
                       went before the Mayor’s Agent [for historic preservation]  the years. There is much more awareness of amenities
                       to get permission to remove a much-modified townhouse  and light.”


































                       Main entrance off Massachusetts Avenue.

                                                                        EVERY STORY HAS TWO SIDES              25
   22   23   24   25   26   27   28   29   30   31   32