        New library at the Archer.

                 Another critical interior improvement involved a  entailing substantial project management challenges.
        hallway that previously exited onto an alley. The architects  Further complicating the work was the fact that “it was
        eliminated that exit and removed one adjacent apartment  hard to even determine how the original mechanical
        unit to create a shared library space, marked by an   systems were designed,” according to David T. Haresign,
        exuberant, semi-custom light fixture that John Edwards,  FAIA. “There was nobody around who knew these
        Assoc. AIA, of Bonstra | Haresign compared to a “giant  systems.” Despite the hurdles, all three projects apparently
        Hedy Lamarr hat.” The library in turn opens onto a large  went smoothly, and the architects report that the residents
        side yard with a terrace and gazebo for residents’ use.  are thrilled with the results.
                 As with the other two projects, the renovation of the
        Archer took place while the building was fully occupied,